Installation of monoblock
Installation of the first monoblock combine both elements – cistern and toilet, as all parts of the set are placed in exactly specified location. Then proceeded to capture the assembled monoblock to the floor using the kit fastening materials. Last connect to supply clean water and sanitation to sewerage outlet.